Production stages buyers can review
- 1
Melting
Qualified iron material is melted at high temperature before cast iron cookware bodies are formed.
Proof points: Material preparation; High-temperature melting; Casting batch start
- 2
Casting
Automated sand-mold forming and molten iron pouring create the cookware body before cleaning and surface preparation.
Proof points: Sand-mold forming; Molten iron pouring; Cookware body forming
- 3
De-sanding
The sand mold is removed and the semi-finished cookware body is cleaned before surface treatment.
Proof points: Mold removal; Blank cleaning; Semi-finished body review
- 4
Shot blasting
Shot blasting removes scale and prepares the casting surface for grinding, coating, seasoning, or machining.
Proof points: Scale removal; Surface preparation; Casting surface review
- 5
Grinding
Manual and machine grinding help keep the cookware blank flat, smooth, and ready for the selected finish.
Proof points: Manual grinding; Machine grinding; Surface flatness review
- 6
Base QC
Base casting inspection screens qualified blanks before enamel, pre-seasoning, nitriding, or CNC machining.
Proof points: Casting surface check; Blank selection; Process routing decision
- 7
Surface treatment routing
Qualified blanks route into enamel coating, pre-seasoning, nitriding, or CNC precision machining depending on the buyer program.
Proof points: Finish selection; Line routing; 6 specialized production lines
- 8
Final QC and assembly
Final QC checks coating consistency, color difference, logo clarity, cookware parts, knobs, handles, and buyer-specific requirements.
Proof points: Final QC; Coating and color review; Logo and accessory assembly
- 9
Checking and packing
Packing follows buyer requirements such as reinforced cartons, mail-order boxes, foam protection, carton marks, and packing lists.
Proof points: Packaging check; Carton mark review; Packing list preparation
- 10
Ready for shipping
Finished goods enter the warehouse and wait for freight-forwarder pickup, loading, and shipment handoff.
Proof points: 10,000 m²; Warehouse handoff; Freight-forwarder pickup
- 11
Shipment and 3% random inspection
Before loading, the factory can apply buyer carton marks and packing lists, then perform a 3% random inspection before shipment.
Proof points: Carton marks; Packing list; 3% random pre-shipment inspection
