OEM/ODM
OEM 铸铁厨具:MOQ、交期和流程说明
从需求到出口包装,逐步理解 OEM 铸铁厨具开发流程。
2026-06-07 · 9 分钟阅读
OEM work begins with a precise brief
The factory needs product type, target size, coating, logo method, packaging expectation, target market, and annual demand estimate.
A precise brief makes sampling faster and reduces avoidable changes later in production.
MOQ depends on what is being customized
Simple logo or packaging changes usually have a lower barrier than custom molds or special enamel colors.
For many cast iron cookware programs, MOQ from 500pcs is a practical starting point for serious B2B buyers.
Sampling should protect mass production
The sample stage should confirm visual details, performance expectations, packaging protection, barcode labels, and inspection criteria.
Once the sample is approved, production planning can move into material preparation, coating, inspection, and shipment scheduling.
买家常见问题
What is the typical lead time for OEM cast iron cookware production?
For existing molds with standard surface finishes, production lead time is typically 30 to 45 days after sample approval. Custom molds add 25 to 45 days for mold development before production begins.
Can I get my logo on cast iron cookware?
Yes. Logos can be applied through cast engraving directly into the mold, laser engraving on handles or lids, or printed on enamel surfaces. Cast engraving is permanent and the most common method for OEM programs.
What packaging options are available for private label cast iron cookware?
Common packaging options include white box, retail color box, gift box with foam insert, and sleeve packaging. Export cartons are standard for all shipments. Custom packaging artwork is typically provided by the buyer and printed by the factory.
